Hello, my name is Tim Donnelly. As a member of the LROC Science Operations Center (SOC) I, along with two others, handle the Downlink duties of the SOC. As Shane Thompson posted earlier, the SOC has two teams - Up-link (UL) and Down-link (DL). UL plans the observation time-line for image acquisition, while DL is responsible for monitoring the LROC instrument health (via real-time and stored telemetry) and data processing (management & processing of all files delivered to the SOC from the Goddard Space Flight Center (GSFC) Mission Operations Center (MOC)). Our two teams constitute the Operations Team to which Ernest Bowman-Cisneros referred in his post last week.